Executed PDS 3D modelling and modification activities for 11 Management of Change (MOC) packages.
Implemented required design modifications in the existing 3D plant model.
Generated and submitted engineering deliverables associated with the modified model, including 3D Model, piping Isometrics, Material Take-Off (MTO), Isometric Index, pipe support drawings, model review reports.
Performed model validation and drawing checks following implementation of MOC changes.
Coordinated model modifications with applicable engineering requirements and project standards.
Supported preparation of accurate engineering deliverables for client review and approval.